Page 1 of 1

#1 Tubes instead of #2

PostPosted: Tue Nov 06, 2012 11:53 am
by lwparchive
Hi,

I found you thru your ebay listing. I have a Stenner pump 85MPHP17 that is from a chlorine injection system and I am adapting it to inject muratic acid into my swimming pool. The 17gpd output is more than I need and was wondering if I could use the #1 tubes to reduce it to 5gpd output?

I see on your site you have tube packs and tube kits available. Can I use the tube packs and swap my ferrules and duckbills, or should they be replaced together?

Thanks, Greg

Re: #1 Tubes instead of #2

PostPosted: Thu Apr 04, 2013 12:49 pm
by dcohan
Yes you can change the tube to a #1. If you order part # UCCP1FD THIS COMES COMPLETE WITH DUCKBILLS & FERRULES